Idle time cost calculator: how much output is your factory losing?
What is your idle time really costing you?
Enter a few numbers about your shop floor. See how much extra output, scrap saved and operator time Yantra24x7 could give back, in about a minute.
Run rotomolding machines? Use the rotomolding ROI calculator
Your shop floor
Rough numbers are fine. You can change any of them.
Improvement assumptions
Typical results we see. Change them if your plant is different.
How do we calculate the estimate?
No black box. Every figure above comes from these four lines, using the numbers you entered.
- 1Capacity
Extra hours = machines × shifts × hours per shift × working days × 12 × (utilization with Yantra24x7 − utilization today). Value = extra hours × value of a machine-hour. Example: 10 machines × 2 shifts × 8 hours × 26 days × 12 months = 49,920 machine-hours a year. Going from 55% to 66% use (20% more output) adds 5,491 hours. At $45 an hour that is $247,104 a year.
- 2Scrap
Scrap saved = parts per month × rejection % × fewer-rejects %, valued at the part value, × 12.
- 3Operators
Operator time = operators × monthly operator cost × time-saved % × 12.
- 4Equivalent machines
Equivalent machines = machines × (utilization with Yantra24x7 ÷ utilization today − 1).