How is OEE calculated?
OEE is the product of three factors: availability, performance and quality. Multiply them and you get one score between 0% and 100%.
- Availability = run time ÷ planned production time. It drops with breakdowns, changeovers, waiting for material and any other stop.
- Performance = (ideal cycle time × parts made) ÷ run time. It drops when the machine runs slower than it can: reduced speed and many small stops.
- Quality = good parts ÷ total parts. It drops with scrap and rework.
What does an OEE calculation look like?
Take one CNC machine with 480 planned minutes in a shift. These example numbers are for illustration only.
| Downtime (setup, tool change, waiting) | 60 min |
| Run time | 420 min |
| Availability | 420 ÷ 480 = 87.5% |
| Ideal cycle time / parts made | 1.0 min / 360 parts |
| Performance | (1.0 × 360) ÷ 420 = 85.7% |
| Good parts / total parts | 351 / 360 |
| Quality | 351 ÷ 360 = 97.5% |
| OEE | 0.875 × 0.857 × 0.975 = 73.1% |
What is a good OEE score?
An OEE of about 85% is often quoted as a world-class benchmark for discrete manufacturing. Plants that have never measured it often find they are well below that, and that most of the gap sits in availability: stops that nobody wrote down. A useful target is not a number from a book but the trend of your own machines, week after week.
Where do the losses usually hide?
Most lost time falls into six groups, and each one hits one of the three factors. Breakdowns and changeovers lower availability. Small stops and reduced speed lower performance. Start-up rejects and production rejects lower quality.
- Breakdowns. Planned maintenance that is skipped turns into unplanned stops later.
- Setup and changeover. Often the single largest planned stop, and the easiest to shorten with a standard routine.
- Small stops. Two or three minutes at a time. They feel harmless, yet twenty of them in a shift is an hour.
- Reduced speed. The machine runs, but slower than its best cycle time, so nobody sees a stop at all.
- Start-up rejects and production rejects. Parts that have to be scrapped or reworked.
How do you improve OEE?
- Measure automatically. Manual logs miss short stops and are filled in at the end of the shift. Machine signals give you every second.
- Record a reason for every stop. The biggest loss is rarely the one people expect. Rank the reasons by lost minutes.
- Fix the top reason first. Changeover time, waiting for material and tool changes are common starting points.
- Show the number where people work. A live OEE on the floor changes behavior faster than a monthly report.
What are the common OEE mistakes?
- Using a cycle time that is not the best one. If the "ideal" time is set to what the machine usually does, performance always looks perfect.
- Counting stops differently on each shift. Agree one list of stop reasons and one rule for planned breaks.
- Averaging many machines into one number. The average hides the one machine that needs help. Look at each machine.
- Looking only at the monthly figure. By then the shift that caused the problem is long gone.
What could your own OEE be?
The ROI calculator turns the idle share of your machines into hours and money. For the machines on your floor, book a diagnostic. See also why CNC machines sit idle.